Section 5.4.8 (c) of the Chapel Hill Land Use Management Ordinance (LUMO) requires that “All stormwater management facilities must be inspected by the responsible party, in accordance with the approved schedule in the stormwater operation and maintenance plan, to identify maintenance and repair needs, and to ensure compliance with the requirement of the recorded operation and maintenance plan.”
The property owner is responsible for the annual inspection of permitted stormwater control measures. The inspection must be performed by a licensed North Carolina Professional Engineer or Landscape Architect with qualified professional stormwater management inspection and maintenance training. The professionals must maintain stormwater training and provide proof of certification or evidence of having taken training upon request.
Please follow the SCM Inspection Report Guidelines(PDF, 207KB) for completing the inspection reports. If a site fails inspection, the report is still due to the Town by the inspection deadline. A 60-day period is then granted for repairs. Note that annual inspection reports submitted are subject to follow-up inspection by Town staff.
A cover sheet is required with each Inspection Report submittal. Please submit electronic reports only.
The Inspection Report forms are below:
SCM Inspection Report Cover Sheet(PDF, 224KB) Updated February 2025
Bioretention Cell SCM Inspection Report(PDF, 453KB)
Dry Pond SCM Inspection Report(PDF, 203KB)
Grass Swale SCM Inspection Report(PDF, 428KB)
Hydrodynamic Separator SCM Inspection Report(PDF, 485KB)
Infiltration Trench SCM Inspection Report(PDF, 156KB) Added May 2025
Level Spreader SCM Inspection Report(PDF, 452KB)
Other Type SCM Inspection Report(PDF, 184KB)
Permeable Pavement SCM Inspection Report(PDF, 444KB)
Sand Filter SCM Inspection Report(PDF, 489KB)
StormFilter SCM Inspection Report(PDF, 482KB)
Stormwater Wetland SCM Inspection Report(PDF, 139KB)
Underground Detention SCM Inspection Report(PDF, 487KB)
Wet Pond SCM Inspection Report(PDF, 203KB)